Completion of pressure testing, rectification and replacement of the defective spare parts of the supplied and installed flush valves
This record consists of general correspondence regarding the completion of pressure testing, rectification and replacement of the defective spare parts of the supplied and installed flush valves of BRACU new campus project.
Hovedforfatter: | Brac University |
---|---|
Format: | General correspondence |
Sprog: | English |
Udgivet: |
Brac University
2023
|
Fag: | |
Online adgang: | http://hdl.handle.net/10361/19993 |
Lignende værker
-
Replacement of the defective flush valve
af: Brac University
Udgivet: (2023) -
Decision of BRACU authority about the defective flush valves supplied by Tilottoma
af: Brac University
Udgivet: (2023) -
Instruction to replace all the flash valves of the WC
af: Brac University
Udgivet: (2023) -
Flush valve issue causing delay of the plumbing works as well as tiling works for the bath rooms in BRACU NCP
af: Brac University
Udgivet: (2023) -
Letter of flush valve replacement
af: Tillotoma Gulshan
Udgivet: (2023)