Completion of pressure testing, rectification and replacement of the defective spare parts of the supplied and installed flush valves
This record consists of general correspondence regarding the completion of pressure testing, rectification and replacement of the defective spare parts of the supplied and installed flush valves of BRACU new campus project.
Autor principal: | Brac University |
---|---|
Format: | General correspondence |
Idioma: | English |
Publicat: |
Brac University
2023
|
Matèries: | |
Accés en línia: | http://hdl.handle.net/10361/19993 |
Ítems similars
-
Replacement of the defective flush valve
per: Brac University
Publicat: (2023) -
Decision of BRACU authority about the defective flush valves supplied by Tilottoma
per: Brac University
Publicat: (2023) -
Instruction to replace all the flash valves of the WC
per: Brac University
Publicat: (2023) -
Flush valve issue causing delay of the plumbing works as well as tiling works for the bath rooms in BRACU NCP
per: Brac University
Publicat: (2023) -
Letter of flush valve replacement
per: Tillotoma Gulshan
Publicat: (2023)