Completion of pressure testing, rectification and replacement of the defective spare parts of the supplied and installed flush valves
This record consists of general correspondence regarding the completion of pressure testing, rectification and replacement of the defective spare parts of the supplied and installed flush valves of BRACU new campus project.
প্রধান লেখক: | Brac University |
---|---|
বিন্যাস: | General correspondence |
ভাষা: | English |
প্রকাশিত: |
Brac University
2023
|
বিষয়গুলি: | |
অনলাইন ব্যবহার করুন: | http://hdl.handle.net/10361/19993 |
অনুরূপ উপাদানগুলি
-
Replacement of the defective flush valve
অনুযায়ী: Brac University
প্রকাশিত: (2023) -
Decision of BRACU authority about the defective flush valves supplied by Tilottoma
অনুযায়ী: Brac University
প্রকাশিত: (2023) -
Instruction to replace all the flash valves of the WC
অনুযায়ী: Brac University
প্রকাশিত: (2023) -
Flush valve issue causing delay of the plumbing works as well as tiling works for the bath rooms in BRACU NCP
অনুযায়ী: Brac University
প্রকাশিত: (2023) -
Letter of flush valve replacement
অনুযায়ী: Tillotoma Gulshan
প্রকাশিত: (2023)