APA引文

University, B. (2023). Completion of pressure testing, rectification and replacement of the defective spare parts of the supplied and installed flush valves. Brac University.

Chicago Style (17th ed.) Citation

University, Brac. Completion of Pressure Testing, Rectification and Replacement of the Defective Spare Parts of the Supplied and Installed Flush Valves. Brac University, 2023.

MLA引文

University, Brac. Completion of Pressure Testing, Rectification and Replacement of the Defective Spare Parts of the Supplied and Installed Flush Valves. Brac University, 2023.

警告:這些引文格式不一定是100%准確.