APA-viite (7. p.)

University, B. (2023). Completion of pressure testing, rectification and replacement of the defective spare parts of the supplied and installed flush valves. Brac University.

Chicago-viite (17. p.)

University, Brac. Completion of Pressure Testing, Rectification and Replacement of the Defective Spare Parts of the Supplied and Installed Flush Valves. Brac University, 2023.

MLA-viite (8. p.)

University, Brac. Completion of Pressure Testing, Rectification and Replacement of the Defective Spare Parts of the Supplied and Installed Flush Valves. Brac University, 2023.

Varoitus: Nämä viitteet eivät aina ole täysin luotettavia.