Immediate action necessary to lift the pipes that are directly placed on the floor with water contacts
This record consists of general correspondence regarding the necessary action to lift the pipes that are directly placed on the floor with water contacts of BRACU new campus project.
Tác giả chính: | Brac University |
---|---|
Định dạng: | General correspondence |
Ngôn ngữ: | English |
Được phát hành: |
Brac University
2023
|
Những chủ đề: | |
Truy cập trực tuyến: | http://hdl.handle.net/10361/19988 |
Những quyển sách tương tự
-
Observation of BRACU on test result and visual inspection report on the fire protection and instruction to start work immediately
Bằng: Brac University
Được phát hành: (2023) -
VO #022 Extra rate of UPVC pipe changed from PVC pipe for conduit works of BRAC University new campus project
Bằng: BUCG-ABC Joint Venture (BUCG-ABC JV)
Được phát hành: (2023) -
Price escalation for plumbing pipe and electricity cable works
Bằng: Brac University
Được phát hành: (2023) -
Piping material for conduiting work in audio visual, PA, IT and security access
Bằng: Brac University
Được phát hành: (2023) -
Observation on delivered pipes and engineer’s instruction to arrange test from BUET
Bằng: Brac University
Được phát hành: (2023)