Immediate action necessary to lift the pipes that are directly placed on the floor with water contacts
This record consists of general correspondence regarding the necessary action to lift the pipes that are directly placed on the floor with water contacts of BRACU new campus project.
Huvudupphovsman: | Brac University |
---|---|
Materialtyp: | General correspondence |
Språk: | English |
Publicerad: |
Brac University
2023
|
Ämnen: | |
Länkar: | http://hdl.handle.net/10361/19988 |
Liknande verk
-
Observation of BRACU on test result and visual inspection report on the fire protection and instruction to start work immediately
av: Brac University
Publicerad: (2023) -
VO #022 Extra rate of UPVC pipe changed from PVC pipe for conduit works of BRAC University new campus project
av: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicerad: (2023) -
Price escalation for plumbing pipe and electricity cable works
av: Brac University
Publicerad: (2023) -
Piping material for conduiting work in audio visual, PA, IT and security access
av: Brac University
Publicerad: (2023) -
Observation on delivered pipes and engineer’s instruction to arrange test from BUET
av: Brac University