Immediate action necessary to lift the pipes that are directly placed on the floor with water contacts
This record consists of general correspondence regarding the necessary action to lift the pipes that are directly placed on the floor with water contacts of BRACU new campus project.
Glavni avtor: | Brac University |
---|---|
Format: | General correspondence |
Jezik: | English |
Izdano: |
Brac University
2023
|
Teme: | |
Online dostop: | http://hdl.handle.net/10361/19988 |
Podobne knjige/članki
-
Observation of BRACU on test result and visual inspection report on the fire protection and instruction to start work immediately
od: Brac University
Izdano: (2023) -
VO #022 Extra rate of UPVC pipe changed from PVC pipe for conduit works of BRAC University new campus project
od: BUCG-ABC Joint Venture (BUCG-ABC JV)
Izdano: (2023) -
Price escalation for plumbing pipe and electricity cable works
od: Brac University
Izdano: (2023) -
Piping material for conduiting work in audio visual, PA, IT and security access
od: Brac University
Izdano: (2023) -
Observation on delivered pipes and engineer’s instruction to arrange test from BUET
od: Brac University
Izdano: (2023)