Immediate action necessary to lift the pipes that are directly placed on the floor with water contacts
This record consists of general correspondence regarding the necessary action to lift the pipes that are directly placed on the floor with water contacts of BRACU new campus project.
Главный автор: | Brac University |
---|---|
Формат: | General correspondence |
Язык: | English |
Опубликовано: |
Brac University
2023
|
Предметы: | |
Online-ссылка: | http://hdl.handle.net/10361/19988 |
Схожие документы
-
Observation of BRACU on test result and visual inspection report on the fire protection and instruction to start work immediately
по: Brac University
Опубликовано: (2023) -
VO #022 Extra rate of UPVC pipe changed from PVC pipe for conduit works of BRAC University new campus project
по: BUCG-ABC Joint Venture (BUCG-ABC JV)
Опубликовано: (2023) -
Price escalation for plumbing pipe and electricity cable works
по: Brac University
Опубликовано: (2023) -
Piping material for conduiting work in audio visual, PA, IT and security access
по: Brac University
Опубликовано: (2023) -
Observation on delivered pipes and engineer’s instruction to arrange test from BUET
по: Brac University
Опубликовано: (2023)