Immediate action necessary to lift the pipes that are directly placed on the floor with water contacts
This record consists of general correspondence regarding the necessary action to lift the pipes that are directly placed on the floor with water contacts of BRACU new campus project.
Κύριος συγγραφέας: | |
---|---|
Μορφή: | General correspondence |
Γλώσσα: | English |
Έκδοση: |
Brac University
2023
|
Θέματα: | |
Διαθέσιμο Online: | http://hdl.handle.net/10361/19988 |
id |
10361-19988 |
---|---|
record_format |
dspace |
spelling |
10361-199882023-08-27T21:04:19Z Immediate action necessary to lift the pipes that are directly placed on the floor with water contacts Brac University New campus project General correspondence Piping works This record consists of general correspondence regarding the necessary action to lift the pipes that are directly placed on the floor with water contacts of BRACU new campus project. 2023-08-27T09:33:47Z 2023-08-27T09:33:47Z ©2022 2022-07-05 General correspondence No.: BRACU-NCP/2022/073A http://hdl.handle.net/10361/19988 en This document is protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. 1 page application/pdf Brac University |
institution |
Brac University |
collection |
Institutional Repository |
language |
English |
topic |
New campus project General correspondence Piping works |
spellingShingle |
New campus project General correspondence Piping works Brac University Immediate action necessary to lift the pipes that are directly placed on the floor with water contacts |
description |
This record consists of general correspondence regarding the necessary action to lift the pipes that are directly placed on the floor with water contacts of BRACU new campus project. |
format |
General correspondence |
author |
Brac University |
author_facet |
Brac University |
author_sort |
Brac University |
title |
Immediate action necessary to lift the pipes that are directly placed on the floor with water contacts |
title_short |
Immediate action necessary to lift the pipes that are directly placed on the floor with water contacts |
title_full |
Immediate action necessary to lift the pipes that are directly placed on the floor with water contacts |
title_fullStr |
Immediate action necessary to lift the pipes that are directly placed on the floor with water contacts |
title_full_unstemmed |
Immediate action necessary to lift the pipes that are directly placed on the floor with water contacts |
title_sort |
immediate action necessary to lift the pipes that are directly placed on the floor with water contacts |
publisher |
Brac University |
publishDate |
2023 |
url |
http://hdl.handle.net/10361/19988 |
work_keys_str_mv |
AT bracuniversity immediateactionnecessarytoliftthepipesthataredirectlyplacedonthefloorwithwatercontacts |
_version_ |
1814309654061121536 |