Immediate action necessary to lift the pipes that are directly placed on the floor with water contacts

This record consists of general correspondence regarding the necessary action to lift the pipes that are directly placed on the floor with water contacts of BRACU new campus project.

গ্রন্থ-পঞ্জীর বিবরন
প্রধান লেখক: Brac University
বিন্যাস: General correspondence
ভাষা:English
প্রকাশিত: Brac University 2023
বিষয়গুলি:
অনলাইন ব্যবহার করুন:http://hdl.handle.net/10361/19988
id 10361-19988
record_format dspace
spelling 10361-199882023-08-27T21:04:19Z Immediate action necessary to lift the pipes that are directly placed on the floor with water contacts Brac University New campus project General correspondence Piping works This record consists of general correspondence regarding the necessary action to lift the pipes that are directly placed on the floor with water contacts of BRACU new campus project. 2023-08-27T09:33:47Z 2023-08-27T09:33:47Z ©2022 2022-07-05 General correspondence No.: BRACU-NCP/2022/073A http://hdl.handle.net/10361/19988 en This document is protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. 1 page application/pdf Brac University
institution Brac University
collection Institutional Repository
language English
topic New campus project
General correspondence
Piping works
spellingShingle New campus project
General correspondence
Piping works
Brac University
Immediate action necessary to lift the pipes that are directly placed on the floor with water contacts
description This record consists of general correspondence regarding the necessary action to lift the pipes that are directly placed on the floor with water contacts of BRACU new campus project.
format General correspondence
author Brac University
author_facet Brac University
author_sort Brac University
title Immediate action necessary to lift the pipes that are directly placed on the floor with water contacts
title_short Immediate action necessary to lift the pipes that are directly placed on the floor with water contacts
title_full Immediate action necessary to lift the pipes that are directly placed on the floor with water contacts
title_fullStr Immediate action necessary to lift the pipes that are directly placed on the floor with water contacts
title_full_unstemmed Immediate action necessary to lift the pipes that are directly placed on the floor with water contacts
title_sort immediate action necessary to lift the pipes that are directly placed on the floor with water contacts
publisher Brac University
publishDate 2023
url http://hdl.handle.net/10361/19988
work_keys_str_mv AT bracuniversity immediateactionnecessarytoliftthepipesthataredirectlyplacedonthefloorwithwatercontacts
_version_ 1814309654061121536