Observation of BRACU on test result and visual inspection report on the fire protection and instruction to start work immediately
This record consists of general correspondence regarding the visual inspection report on the fire protection after observation and order to start piping work of BRACU new campus project.
Tác giả chính: | Brac University |
---|---|
Định dạng: | General correspondence |
Ngôn ngữ: | English |
Được phát hành: |
Brac University
2023
|
Những chủ đề: | |
Truy cập trực tuyến: | http://hdl.handle.net/10361/19980 |
Những quyển sách tương tự
-
Observation of BRACU on the test result and visual inspection report on the fire protection pipes and instruction to start the piping work immediately
Bằng: Brac University
Được phát hành: (2023) -
Instruction to start the work at BRACU new campus project (Fire detection & fire protection)
Bằng: Brac University
Được phát hành: (2023) -
Instruction to start the work of fire detection & fire protection at BRACU new campus project
Bằng: Brac University
Được phát hành: (2023) -
Regarding test result as well as visual inspection report on the fire protection pipes
Bằng: Brac University
Được phát hành: (2023) -
Request to release advance payment immediately upon fire protection coating
Bằng: BUCG-ABC Joint Venture (BUCG-ABC JV)
Được phát hành: (2023)