Observation of BRACU on test result and visual inspection report on the fire protection and instruction to start work immediately
This record consists of general correspondence regarding the visual inspection report on the fire protection after observation and order to start piping work of BRACU new campus project.
Yazar: | Brac University |
---|---|
Materyal Türü: | General correspondence |
Dil: | English |
Baskı/Yayın Bilgisi: |
Brac University
2023
|
Konular: | |
Online Erişim: | http://hdl.handle.net/10361/19980 |
Benzer Materyaller
-
Observation of BRACU on the test result and visual inspection report on the fire protection pipes and instruction to start the piping work immediately
Yazar:: Brac University
Baskı/Yayın Bilgisi: (2023) -
Instruction to start the work at BRACU new campus project (Fire detection & fire protection)
Yazar:: Brac University
Baskı/Yayın Bilgisi: (2023) -
Instruction to start the work of fire detection & fire protection at BRACU new campus project
Yazar:: Brac University
Baskı/Yayın Bilgisi: (2023) -
Regarding test result as well as visual inspection report on the fire protection pipes
Yazar:: Brac University
Baskı/Yayın Bilgisi: (2023) -
Request to release advance payment immediately upon fire protection coating
Yazar:: BUCG-ABC Joint Venture (BUCG-ABC JV)
Baskı/Yayın Bilgisi: (2023)