Observation of BRACU on test result and visual inspection report on the fire protection and instruction to start work immediately
This record consists of general correspondence regarding the visual inspection report on the fire protection after observation and order to start piping work of BRACU new campus project.
Главный автор: | Brac University |
---|---|
Формат: | General correspondence |
Язык: | English |
Опубликовано: |
Brac University
2023
|
Предметы: | |
Online-ссылка: | http://hdl.handle.net/10361/19980 |
Схожие документы
-
Observation of BRACU on the test result and visual inspection report on the fire protection pipes and instruction to start the piping work immediately
по: Brac University
Опубликовано: (2023) -
Instruction to start the work at BRACU new campus project (Fire detection & fire protection)
по: Brac University
Опубликовано: (2023) -
Instruction to start the work of fire detection & fire protection at BRACU new campus project
по: Brac University
Опубликовано: (2023) -
Regarding test result as well as visual inspection report on the fire protection pipes
по: Brac University
Опубликовано: (2023) -
Request to release advance payment immediately upon fire protection coating
по: BUCG-ABC Joint Venture (BUCG-ABC JV)
Опубликовано: (2023)