Observation of BRACU on test result and visual inspection report on the fire protection and instruction to start work immediately
This record consists of general correspondence regarding the visual inspection report on the fire protection after observation and order to start piping work of BRACU new campus project.
Hoofdauteur: | Brac University |
---|---|
Formaat: | General correspondence |
Taal: | English |
Gepubliceerd in: |
Brac University
2023
|
Onderwerpen: | |
Online toegang: | http://hdl.handle.net/10361/19980 |
Gelijkaardige items
-
Observation of BRACU on the test result and visual inspection report on the fire protection pipes and instruction to start the piping work immediately
door: Brac University
Gepubliceerd in: (2023) -
Instruction to start the work at BRACU new campus project (Fire detection & fire protection)
door: Brac University
Gepubliceerd in: (2023) -
Instruction to start the work of fire detection & fire protection at BRACU new campus project
door: Brac University
Gepubliceerd in: (2023) -
Regarding test result as well as visual inspection report on the fire protection pipes
door: Brac University
Gepubliceerd in: (2023) -
Request to release advance payment immediately upon fire protection coating
door: BUCG-ABC Joint Venture (BUCG-ABC JV)
Gepubliceerd in: (2023)