Observation of BRACU on test result and visual inspection report on the fire protection and instruction to start work immediately
This record consists of general correspondence regarding the visual inspection report on the fire protection after observation and order to start piping work of BRACU new campus project.
Autore principale: | Brac University |
---|---|
Natura: | General correspondence |
Lingua: | English |
Pubblicazione: |
Brac University
2023
|
Soggetti: | |
Accesso online: | http://hdl.handle.net/10361/19980 |
Documenti analoghi
-
Observation of BRACU on the test result and visual inspection report on the fire protection pipes and instruction to start the piping work immediately
di: Brac University
Pubblicazione: (2023) -
Instruction to start the work at BRACU new campus project (Fire detection & fire protection)
di: Brac University
Pubblicazione: (2023) -
Instruction to start the work of fire detection & fire protection at BRACU new campus project
di: Brac University
Pubblicazione: (2023) -
Regarding test result as well as visual inspection report on the fire protection pipes
di: Brac University
Pubblicazione: (2023) -
Request to release advance payment immediately upon fire protection coating
di: BUCG-ABC Joint Venture (BUCG-ABC JV)