Observation of BRACU on test result and visual inspection report on the fire protection and instruction to start work immediately
This record consists of general correspondence regarding the visual inspection report on the fire protection after observation and order to start piping work of BRACU new campus project.
Հիմնական հեղինակ: | Brac University |
---|---|
Ձևաչափ: | General correspondence |
Լեզու: | English |
Հրապարակվել է: |
Brac University
2023
|
Խորագրեր: | |
Առցանց հասանելիություն: | http://hdl.handle.net/10361/19980 |
Նմանատիպ նյութեր
-
Observation of BRACU on the test result and visual inspection report on the fire protection pipes and instruction to start the piping work immediately
: Brac University
Հրապարակվել է: (2023) -
Instruction to start the work at BRACU new campus project (Fire detection & fire protection)
: Brac University
Հրապարակվել է: (2023) -
Instruction to start the work of fire detection & fire protection at BRACU new campus project
: Brac University
Հրապարակվել է: (2023) -
Regarding test result as well as visual inspection report on the fire protection pipes
: Brac University
Հրապարակվել է: (2023) -
Request to release advance payment immediately upon fire protection coating
: BUCG-ABC Joint Venture (BUCG-ABC JV)
Հրապարակվել է: (2023)