Observation of BRACU on test result and visual inspection report on the fire protection and instruction to start work immediately
This record consists of general correspondence regarding the visual inspection report on the fire protection after observation and order to start piping work of BRACU new campus project.
מחבר ראשי: | Brac University |
---|---|
פורמט: | General correspondence |
שפה: | English |
יצא לאור: |
Brac University
2023
|
נושאים: | |
גישה מקוונת: | http://hdl.handle.net/10361/19980 |
פריטים דומים
-
Observation of BRACU on the test result and visual inspection report on the fire protection pipes and instruction to start the piping work immediately
מאת: Brac University
יצא לאור: (2023) -
Instruction to start the work at BRACU new campus project (Fire detection & fire protection)
מאת: Brac University
יצא לאור: (2023) -
Instruction to start the work of fire detection & fire protection at BRACU new campus project
מאת: Brac University
יצא לאור: (2023) -
Regarding test result as well as visual inspection report on the fire protection pipes
מאת: Brac University
יצא לאור: (2023) -
Request to release advance payment immediately upon fire protection coating
מאת: BUCG-ABC Joint Venture (BUCG-ABC JV)
יצא לאור: (2023)