Observation of BRACU on test result and visual inspection report on the fire protection and instruction to start work immediately
This record consists of general correspondence regarding the visual inspection report on the fire protection after observation and order to start piping work of BRACU new campus project.
Autor principal: | Brac University |
---|---|
Format: | General correspondence |
Idioma: | English |
Publicat: |
Brac University
2023
|
Matèries: | |
Accés en línia: | http://hdl.handle.net/10361/19980 |
Ítems similars
-
Observation of BRACU on the test result and visual inspection report on the fire protection pipes and instruction to start the piping work immediately
per: Brac University
Publicat: (2023) -
Instruction to start the work at BRACU new campus project (Fire detection & fire protection)
per: Brac University
Publicat: (2023) -
Instruction to start the work of fire detection & fire protection at BRACU new campus project
per: Brac University
Publicat: (2023) -
Regarding test result as well as visual inspection report on the fire protection pipes
per: Brac University
Publicat: (2023) -
Request to release advance payment immediately upon fire protection coating
per: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicat: (2023)