Observation of BRACU on test result and visual inspection report on the fire protection and instruction to start work immediately
This record consists of general correspondence regarding the visual inspection report on the fire protection after observation and order to start piping work of BRACU new campus project.
المؤلف الرئيسي: | Brac University |
---|---|
التنسيق: | General correspondence |
اللغة: | English |
منشور في: |
Brac University
2023
|
الموضوعات: | |
الوصول للمادة أونلاين: | http://hdl.handle.net/10361/19980 |
مواد مشابهة
-
Observation of BRACU on the test result and visual inspection report on the fire protection pipes and instruction to start the piping work immediately
بواسطة: Brac University
منشور في: (2023) -
Instruction to start the work at BRACU new campus project (Fire detection & fire protection)
بواسطة: Brac University
منشور في: (2023) -
Instruction to start the work of fire detection & fire protection at BRACU new campus project
بواسطة: Brac University
منشور في: (2023) -
Regarding test result as well as visual inspection report on the fire protection pipes
بواسطة: Brac University
منشور في: (2023) -
Request to release advance payment immediately upon fire protection coating
بواسطة: BUCG-ABC Joint Venture (BUCG-ABC JV)
منشور في: (2023)