Regarding thickness of putty before painting and the checklist for the finishing work
This record consists of general correspondence regarding the thickness of putty before painting and the checklist for the finishing work of BRACU new campus project.
| المؤلف الرئيسي: | Brac University |
|---|---|
| التنسيق: | General correspondence |
| اللغة: | English |
| منشور في: |
Brac University
2023
|
| الموضوعات: | |
| الوصول للمادة أونلاين: | http://hdl.handle.net/10361/19971 |
مواد مشابهة
-
Regarding submission of checklist
بواسطة: Brac University
منشور في: (2023) -
Delayed submitting of check list for concreting work
بواسطة: Brac University
منشور في: (2023) -
Submitting inspection checklist for concreting, structural steel and other major works
بواسطة: Brac University
منشور في: (2023) -
Submission inspection checklist for concreting, structural steel and other major works of BRAC University new campus project
بواسطة: BUCG-ABC Joint Venture (BUCG-ABC JV)
منشور في: (2023) -
Request for advance payment for material procurement for finishing work
بواسطة: Brac University
منشور في: (2023)