Rectifying the railing mock-up and install in the BRAC University new campus project site
This record consists of general correspondence regarding rectifying the railing mock-up and install in the site of BRAC University new campus project.
Tác giả chính: | Brac University |
---|---|
Định dạng: | General correspondence |
Ngôn ngữ: | English |
Được phát hành: |
Brac University
2023
|
Những chủ đề: | |
Truy cập trực tuyến: | http://hdl.handle.net/10361/19967 |
Những quyển sách tương tự
-
Status of metal railing work of BRAC University new campus project
Bằng: Brac University
Được phát hành: (2023) -
Purchase order for supply & installation of MS Z-Louver railing works for the jogging track on roof for BRAC University new campus project
Bằng: Brac University
Được phát hành: (2023) -
Purchase order for the engagement of the designer for the design of railing and henna ceiling for BRACU new campus project
Bằng: Brac University
Được phát hành: (2023) -
Status of metal railing work
Bằng: Brac University
Được phát hành: (2023) -
Railings (Architectural Consultant Drawings)
Bằng: WOHA Designs PTE LTD
Được phát hành: (2023)