Rectifying the railing mock-up and install in the BRAC University new campus project site
This record consists of general correspondence regarding rectifying the railing mock-up and install in the site of BRAC University new campus project.
Автор: | Brac University |
---|---|
Формат: | General correspondence |
Мова: | English |
Опубліковано: |
Brac University
2023
|
Предмети: | |
Онлайн доступ: | http://hdl.handle.net/10361/19967 |
Схожі ресурси
-
Status of metal railing work of BRAC University new campus project
за авторством: Brac University
Опубліковано: (2023) -
Purchase order for supply & installation of MS Z-Louver railing works for the jogging track on roof for BRAC University new campus project
за авторством: Brac University
Опубліковано: (2023) -
Purchase order for the engagement of the designer for the design of railing and henna ceiling for BRACU new campus project
за авторством: Brac University
Опубліковано: (2023) -
Status of metal railing work
за авторством: Brac University
Опубліковано: (2023) -
Railings (Architectural Consultant Drawings)
за авторством: WOHA Designs PTE LTD
Опубліковано: (2023)