Rectifying the railing mock-up and install in the BRAC University new campus project site
This record consists of general correspondence regarding rectifying the railing mock-up and install in the site of BRAC University new campus project.
Yazar: | Brac University |
---|---|
Materyal Türü: | General correspondence |
Dil: | English |
Baskı/Yayın Bilgisi: |
Brac University
2023
|
Konular: | |
Online Erişim: | http://hdl.handle.net/10361/19967 |
Benzer Materyaller
-
Status of metal railing work of BRAC University new campus project
Yazar:: Brac University
Baskı/Yayın Bilgisi: (2023) -
Purchase order for supply & installation of MS Z-Louver railing works for the jogging track on roof for BRAC University new campus project
Yazar:: Brac University
Baskı/Yayın Bilgisi: (2023) -
Purchase order for the engagement of the designer for the design of railing and henna ceiling for BRACU new campus project
Yazar:: Brac University
Baskı/Yayın Bilgisi: (2023) -
Status of metal railing work
Yazar:: Brac University
Baskı/Yayın Bilgisi: (2023) -
Railings (Architectural Consultant Drawings)
Yazar:: WOHA Designs PTE LTD
Baskı/Yayın Bilgisi: (2023)