Rectifying the railing mock-up and install in the BRAC University new campus project site
This record consists of general correspondence regarding rectifying the railing mock-up and install in the site of BRAC University new campus project.
1. autor: | Brac University |
---|---|
Format: | General correspondence |
Język: | English |
Wydane: |
Brac University
2023
|
Hasła przedmiotowe: | |
Dostęp online: | http://hdl.handle.net/10361/19967 |
Podobne zapisy
-
Status of metal railing work of BRAC University new campus project
od: Brac University
Wydane: (2023) -
Purchase order for supply & installation of MS Z-Louver railing works for the jogging track on roof for BRAC University new campus project
od: Brac University
Wydane: (2023) -
Purchase order for the engagement of the designer for the design of railing and henna ceiling for BRACU new campus project
od: Brac University
Wydane: (2023) -
Status of metal railing work
od: Brac University
Wydane: (2023) -
Railings (Architectural Consultant Drawings)
od: WOHA Designs PTE LTD
Wydane: (2023)