Rectifying the railing mock-up and install in the BRAC University new campus project site
This record consists of general correspondence regarding rectifying the railing mock-up and install in the site of BRAC University new campus project.
第一著者: | Brac University |
---|---|
フォーマット: | General correspondence |
言語: | English |
出版事項: |
Brac University
2023
|
主題: | |
オンライン・アクセス: | http://hdl.handle.net/10361/19967 |
類似資料
類似資料
-
Status of metal railing work of BRAC University new campus project
著者:: Brac University
出版事項: (2023) -
Purchase order for supply & installation of MS Z-Louver railing works for the jogging track on roof for BRAC University new campus project
著者:: Brac University
出版事項: (2023) -
Purchase order for the engagement of the designer for the design of railing and henna ceiling for BRACU new campus project
著者:: Brac University
出版事項: (2023) -
Status of metal railing work
著者:: Brac University
出版事項: (2023) -
Railings (Architectural Consultant Drawings)
著者:: WOHA Designs PTE LTD
出版事項: (2023)