Rectifying the railing mock-up and install in the BRAC University new campus project site
This record consists of general correspondence regarding rectifying the railing mock-up and install in the site of BRAC University new campus project.
1. Verfasser: | Brac University |
---|---|
Format: | General correspondence |
Sprache: | English |
Veröffentlicht: |
Brac University
2023
|
Schlagworte: | |
Online Zugang: | http://hdl.handle.net/10361/19967 |
Ähnliche Einträge
-
Status of metal railing work of BRAC University new campus project
von: Brac University
Veröffentlicht: (2023) -
Purchase order for supply & installation of MS Z-Louver railing works for the jogging track on roof for BRAC University new campus project
von: Brac University
Veröffentlicht: (2023) -
Purchase order for the engagement of the designer for the design of railing and henna ceiling for BRACU new campus project
von: Brac University
Veröffentlicht: (2023) -
Status of metal railing work
von: Brac University
Veröffentlicht: (2023) -
Railings (Architectural Consultant Drawings)
von: WOHA Designs PTE LTD
Veröffentlicht: (2023)