Submitting schedule for some pending works
This record consists of general correspondence regarding the submission of schedule for some pending works of BRACU new campus project.
المؤلف الرئيسي: | Brac University |
---|---|
التنسيق: | General correspondence |
اللغة: | English |
منشور في: |
Brac University
2023
|
الموضوعات: | |
الوصول للمادة أونلاين: | http://hdl.handle.net/10361/19961 |
مواد مشابهة
-
Request for submitting shop drawing for PV roof and jogging track steel structure
بواسطة: Brac University
منشور في: (2023) -
Re: Request for submitting shop drawing for PV roof and jogging track steel structure
بواسطة: BUCG-ABC Joint Venture (BUCG-ABC JV)
منشور في: (2023) -
Regarding PV roof of BRAC University new campus project
بواسطة: Brac University
منشور في: (2023) -
The engineer's observation and instruction regarding the concreting works at utility portion
بواسطة: Brac University
منشور في: (2023) -
PV roof beam layout plan_Rev A