Finishing schedule
This record consists of general correspondence regarding finishing schedule of BRAC University new campus project.
Главный автор: | Brac University |
---|---|
Формат: | General correspondence |
Язык: | English |
Опубликовано: |
Brac University
2023
|
Предметы: | |
Online-ссылка: | http://hdl.handle.net/10361/19953 |
Схожие документы
-
Re: Finishing schedule
по: BUCG-ABC Joint Venture (BUCG-ABC JV)
Опубликовано: (2023) -
Finish schedule detail (RFA-473_Rev.B)
по: BUCG-ABC Joint Venture (BUCG-ABC JV)
Опубликовано: (2023) -
Finish schedule detail (RFA-473_Rev B)
по: WOHA Designs PTE LTD, и др.
Опубликовано: (2023) -
Architectural submittal schedule
по: Brac University
Опубликовано: (2023) -
Submission of updated master schedule
по: Brac University
Опубликовано: (2023)