Regarding omitting waterproofing work in some areas of BRAC University new campus project
This record consists of general correspondence regarding omitting waterproofing work in some areas of BRAC University new campus project.
Yazar: | Brac University |
---|---|
Materyal Türü: | General correspondence |
Dil: | English |
Baskı/Yayın Bilgisi: |
Brac University
2023
|
Konular: | |
Online Erişim: | http://hdl.handle.net/10361/19952 |
Benzer Materyaller
-
Omitting waterproofing work in some areas of BRAC University new campus project
Yazar:: Brac University
Baskı/Yayın Bilgisi: (2023) -
Regarding risks of waterproofing work for BRAC University new campus
Yazar:: BUCG-ABC Joint Venture (BUCG-ABC JV)
Baskı/Yayın Bilgisi: (2023) -
Instruction on the type of waterproofing treatment to be done in different location of BRAC University new campus project
Yazar:: Brac University
Baskı/Yayın Bilgisi: (2023) -
Reasons for replacing brand of waterproof materials of BRAC University new campus project
Yazar:: BUCG-ABC Joint Venture (BUCG-ABC JV)
Baskı/Yayın Bilgisi: (2023) -
Revised decision on the waterproofing work in the bathroom floors and rooftop landscaping area
Yazar:: Brac University
Baskı/Yayın Bilgisi: (2023)