Omitting waterproofing work in some areas of BRAC University new campus project
This record consists of general correspondence regarding omitting waterproofing work in some areas of BRAC University new campus project.
1. autor: | Brac University |
---|---|
Format: | General correspondence |
Język: | English |
Wydane: |
Brac University
2023
|
Hasła przedmiotowe: | |
Dostęp online: | http://hdl.handle.net/10361/19949 |
Podobne zapisy
-
Regarding omitting waterproofing work in some areas of BRAC University new campus project
od: Brac University
Wydane: (2023) -
Regarding risks of waterproofing work for BRAC University new campus
od: BUCG-ABC Joint Venture (BUCG-ABC JV)
Wydane: (2023) -
Instruction on the type of waterproofing treatment to be done in different location of BRAC University new campus project
od: Brac University
Wydane: (2023) -
Reasons for replacing brand of waterproof materials of BRAC University new campus project
od: BUCG-ABC Joint Venture (BUCG-ABC JV)
Wydane: (2023) -
Evaluation for additional work of waterproofing on the retaining wall and capping beam of BRAC University new campus project
od: Brac University
Wydane: (2023)