The engineer’s Instruction for rectification of opening for escalator in grid ‘X, 19-20 & W, 19-20’ of B1 to B1 (A-)
This record consists of general correspondence regarding the engineer’s Instruction for rectification of opening for escalator in grid ‘X, 19-20 & W, 19-20’ of B1 to B1 (A- of BRACU new campus project site.
主要作者: | Brac University |
---|---|
格式: | General correspondence |
語言: | English |
出版: |
Brac University
2023
|
主題: | |
在線閱讀: | http://hdl.handle.net/10361/19946 |
相似書籍
-
The engineer's instruction for rectification of opening for escalator in grid 'X, 19-20 & W, 19-20' of B1 to B1(A)
由: BUCG-ABC Joint Venture (BUCG-ABC JV)
出版: (2023) -
Instruction to do beam rectification work as per WEB sketch (SK125)
由: BUCG-ABC Joint Venture (BUCG-ABC JV)
出版: (2023) -
Instruction to start the work of lift and escalator at BRACU new campus project
由: Brac University
出版: (2023) -
Regarding rectification of escalator opening of BRAC University new campus project
由: Brac University
出版: (2023) -
Confirmation to manufacture north zone escalator from B1 to Level 10
由: Brac University
出版: (2023)