Damaging and breaking the employer supplied tiles during handling/shifting and placing/fixing tiles
This record consists of general correspondence regarding the damage of tiles while working for BRACU new campus project.
Hovedforfatter: | Brac University |
---|---|
Format: | General correspondence |
Sprog: | English |
Udgivet: |
Brac University
2023
|
Fag: | |
Online adgang: | http://hdl.handle.net/10361/19944 |
Lignende værker
-
Damaging and breaking the employer supplied tiles during handling/shifting and placing/fixing tiles
af: Brac University
Udgivet: (2023) -
Rejected tiles-type TL-1 - TL-2, supplying of 2nd consignment of tiles TL-1 and TL-2 and supplying 1st lot of tile type TL-6
af: Brac University
Udgivet: (2023) -
Request for supplying bag cement for tiling work
af: BUCG-ABC Joint Venture (BUCG-ABC JV)
Udgivet: (2023) -
Mock-up for tiling work
af: Brac University
Udgivet: (2023) -
Instruction to complete the tiling work in the floors 6 to 12 and the toilets
af: Brac University
Udgivet: (2023)