The engineer’s Instruction to stake the connecting vertical plate of pre-engineering steel column
This record consists of general correspondence regarding the engineer’s Instruction to stake the connecting vertical plate of pre-engineering steel column of BRACU new campus project site.
Main Author: | Brac University |
---|---|
Format: | General correspondence |
Language: | English |
Published: |
Brac University
2023
|
Subjects: | |
Online Access: | http://hdl.handle.net/10361/19935 |
Similar Items
-
Instruction to submit supply schedule for pre-engineering steel section
by: Brac University
Published: (2023) -
Free convection and mass transfer flow past an infinite vertical porous plate with dufour and soret effects in a porus medium
by: Alam, Md. Shariful, et al.
Published: (2010) -
Combined effects of radiation and heat generation on MHD natural convection flow along a vertical flat plate in presence of heat conduction
by: Ali, Mohammad Mokaddes, et al.
Published: (2010) -
Regarding inspection of pre-engineering steel sections
by: Brac University
Published: (2023) -
Submission of detail quantity of pre-engineering steel section
by: Brac University
Published: (2023)