Instruction to start the work of sanitary wares fixtures and fittings at BRACU new campus project
This record consists of general correspondence regarding instruction to start the work of sanitary wares fixtures and fittings of BRAC University new campus project.
المؤلف الرئيسي: | Brac University |
---|---|
التنسيق: | General correspondence |
اللغة: | English |
منشور في: |
Brac University
2023
|
الموضوعات: | |
الوصول للمادة أونلاين: | http://hdl.handle.net/10361/19932 |
مواد مشابهة
-
Instruction to start the work at BRACU new campus project (Sanitary wares fixtures and fittings)
بواسطة: Brac University
منشور في: (2023) -
Providing specimens of sanitary ware and socket outlet of basement
بواسطة: BUCG-ABC Joint Venture (BUCG-ABC JV)
منشور في: (2023) -
Instruction to start the work of substation at BRACU new campus project
بواسطة: Brac University
منشور في: (2023) -
Instruction to start the work at BRACU new campus project (Generator)
بواسطة: Brac University
منشور في: (2023) -
Instruction to start the work at BRACU new campus project (Substation)
بواسطة: Brac University
منشور في: (2023)