Instruction to complete the tiling work in the floors 6 to 12 and the toilets
This record consists of general correspondence regarding the instruction to complete the tiling work in the floors 6 to 12 and the toilets of BRACU new campus building.
Autor principal: | |
---|---|
Formato: | General correspondence |
Lenguaje: | English |
Publicado: |
Brac University
2023
|
Materias: | |
Acceso en línea: | http://hdl.handle.net/10361/19930 |