Instruction to complete the tiling work in the floors 6 to 12 and the toilets
This record consists of general correspondence regarding the instruction to complete the tiling work in the floors 6 to 12 and the toilets of BRACU new campus building.
第一著者: | Brac University |
---|---|
フォーマット: | General correspondence |
言語: | English |
出版事項: |
Brac University
2023
|
主題: | |
オンライン・アクセス: | http://hdl.handle.net/10361/19930 |
類似資料
-
Rejected tiles-type TL-1 - TL-2, supplying of 2nd consignment of tiles TL-1 and TL-2 and supplying 1st lot of tile type TL-6
著者:: Brac University
出版事項: (2023) -
Methodology of tiling work of BRAC University new campus project
著者:: Brac University
出版事項: (2023) -
Damaging and breaking the employer supplied tiles during handling/shifting and placing/fixing tiles
著者:: Brac University
出版事項: (2023) -
Damaging and breaking the employer supplied tiles during handling/shifting and placing/fixing tiles
著者:: Brac University
出版事項: (2023) -
Taking spot levels and preparing pre-work of the tiling areas
著者:: Brac University
出版事項: (2023)