Instruction to complete the tiling work in the floors 6 to 12 and the toilets
This record consists of general correspondence regarding the instruction to complete the tiling work in the floors 6 to 12 and the toilets of BRACU new campus building.
Hlavní autor: | Brac University |
---|---|
Médium: | General correspondence |
Jazyk: | English |
Vydáno: |
Brac University
2023
|
Témata: | |
On-line přístup: | http://hdl.handle.net/10361/19930 |
Podobné jednotky
-
Rejected tiles-type TL-1 - TL-2, supplying of 2nd consignment of tiles TL-1 and TL-2 and supplying 1st lot of tile type TL-6
Autor: Brac University
Vydáno: (2023) -
Methodology of tiling work of BRAC University new campus project
Autor: Brac University
Vydáno: (2023) -
Damaging and breaking the employer supplied tiles during handling/shifting and placing/fixing tiles
Autor: Brac University
Vydáno: (2023) -
Damaging and breaking the employer supplied tiles during handling/shifting and placing/fixing tiles
Autor: Brac University
Vydáno: (2023) -
Taking spot levels and preparing pre-work of the tiling areas
Autor: Brac University
Vydáno: (2023)