Instruction to complete the tiling work in the floors 6 to 12 and the toilets
This record consists of general correspondence regarding the instruction to complete the tiling work in the floors 6 to 12 and the toilets of BRACU new campus building.
Autor principal: | Brac University |
---|---|
Format: | General correspondence |
Idioma: | English |
Publicat: |
Brac University
2023
|
Matèries: | |
Accés en línia: | http://hdl.handle.net/10361/19930 |
Ítems similars
-
Rejected tiles-type TL-1 - TL-2, supplying of 2nd consignment of tiles TL-1 and TL-2 and supplying 1st lot of tile type TL-6
per: Brac University
Publicat: (2023) -
Methodology of tiling work of BRAC University new campus project
per: Brac University
Publicat: (2023) -
Damaging and breaking the employer supplied tiles during handling/shifting and placing/fixing tiles
per: Brac University
Publicat: (2023) -
Damaging and breaking the employer supplied tiles during handling/shifting and placing/fixing tiles
per: Brac University
Publicat: (2023) -
Taking spot levels and preparing pre-work of the tiling areas
per: Brac University
Publicat: (2023)