Instruction to start the work of MDB & DB at BRACU new campus project
This record consists of general correspondence regarding instruction to start the work of MDB & DB of BRAC University new campus project.
Yazar: | Brac University |
---|---|
Materyal Türü: | General correspondence |
Dil: | English |
Baskı/Yayın Bilgisi: |
Brac University
2023
|
Konular: | |
Online Erişim: | http://hdl.handle.net/10361/19929 |
Benzer Materyaller
-
Instruction to start the work at BRACU new campus project (MDB & DB)
Yazar:: Brac University
Baskı/Yayın Bilgisi: (2023) -
Cancellation of request for tender of HVAC system, lift & escalators, fire detection & protection, generator, substation, Busbar Trunking (BBT), photovoltaic solar system, Main Distribution Board (MDB) and Distribution Board
Yazar:: Brac University
Baskı/Yayın Bilgisi: (2023) -
Full set electrical plan with MDB and DB system
Yazar:: WOHA Designs PTE LTD, ve diğerleri
Baskı/Yayın Bilgisi: (2023) -
Financial and technical proposal of procurement of lift & escalators, HVAC system, fire detection & protection, generator, sub-station, BBT, MDB and SDB, solar panel, lightning protection
Yazar:: Brac University
Baskı/Yayın Bilgisi: (2023) -
Local business voice
Yazar:: Bennett, R. J.