Regarding inspection report of fire pump at BRACU NCP
This record consists of general correspondence regarding inspection report of fire pump at BRACU new campus project.
Автор: | Brac University |
---|---|
Формат: | General correspondence |
Мова: | English |
Опубліковано: |
Brac University
2023
|
Предмети: | |
Онлайн доступ: | http://hdl.handle.net/10361/19907 |
Схожі ресурси
-
Regarding inspection report of fire pump at BRACU NCP
за авторством: Bengal Technological Corporation Ltd.(BTCL)
Опубліковано: (2023) -
Regarding test result as well as visual inspection report on the fire protection pipes
за авторством: Brac University
Опубліковано: (2023) -
Clarification needed from Patterson Pumps (the manufacturer) regarding a major difference between the pumps ordered by BRAC University and pumps delivered by the contractor at project site
за авторством: Brac University
Опубліковано: (2023) -
Regarding fire incidents and further precaution
за авторством: Brac University
Опубліковано: (2023) -
Regarding fire incidents and further precaution
за авторством: Brac University
Опубліковано: (2023)