Regarding inspection report of fire pump at BRACU NCP
This record consists of general correspondence regarding inspection report of fire pump at BRACU new campus project.
1. autor: | Brac University |
---|---|
Format: | General correspondence |
Język: | English |
Wydane: |
Brac University
2023
|
Hasła przedmiotowe: | |
Dostęp online: | http://hdl.handle.net/10361/19907 |
Podobne zapisy
-
Regarding inspection report of fire pump at BRACU NCP
od: Bengal Technological Corporation Ltd.(BTCL)
Wydane: (2023) -
Regarding test result as well as visual inspection report on the fire protection pipes
od: Brac University
Wydane: (2023) -
Clarification needed from Patterson Pumps (the manufacturer) regarding a major difference between the pumps ordered by BRAC University and pumps delivered by the contractor at project site
od: Brac University
Wydane: (2023) -
Regarding fire incidents and further precaution
od: Brac University
Wydane: (2023) -
Regarding fire incidents and further precaution
od: Brac University
Wydane: (2023)