Regarding inspection report of fire pump at BRACU NCP
This record consists of general correspondence regarding inspection report of fire pump at BRACU new campus project.
Hoofdauteur: | Brac University |
---|---|
Formaat: | General correspondence |
Taal: | English |
Gepubliceerd in: |
Brac University
2023
|
Onderwerpen: | |
Online toegang: | http://hdl.handle.net/10361/19907 |
Gelijkaardige items
-
Regarding inspection report of fire pump at BRACU NCP
door: Bengal Technological Corporation Ltd.(BTCL)
Gepubliceerd in: (2023) -
Regarding test result as well as visual inspection report on the fire protection pipes
door: Brac University
Gepubliceerd in: (2023) -
Clarification needed from Patterson Pumps (the manufacturer) regarding a major difference between the pumps ordered by BRAC University and pumps delivered by the contractor at project site
door: Brac University
Gepubliceerd in: (2023) -
Regarding fire incidents and further precaution
door: Brac University
Gepubliceerd in: (2023) -
Regarding fire incidents and further precaution
door: Brac University
Gepubliceerd in: (2023)