Regarding inspection report of fire pump at BRACU NCP
This record consists of general correspondence regarding inspection report of fire pump at BRACU new campus project.
Autore principale: | Brac University |
---|---|
Natura: | General correspondence |
Lingua: | English |
Pubblicazione: |
Brac University
2023
|
Soggetti: | |
Accesso online: | http://hdl.handle.net/10361/19907 |
Documenti analoghi
-
Regarding inspection report of fire pump at BRACU NCP
di: Bengal Technological Corporation Ltd.(BTCL)
Pubblicazione: (2023) -
Regarding test result as well as visual inspection report on the fire protection pipes
di: Brac University
Pubblicazione: (2023) -
Clarification needed from Patterson Pumps (the manufacturer) regarding a major difference between the pumps ordered by BRAC University and pumps delivered by the contractor at project site
di: Brac University
Pubblicazione: (2023) -
Regarding fire incidents and further precaution
di: Brac University
Pubblicazione: (2023) -
Regarding fire incidents and further precaution
di: Brac University
Pubblicazione: (2023)