Regarding inspection report of fire pump at BRACU NCP
This record consists of general correspondence regarding inspection report of fire pump at BRACU new campus project.
Príomhchruthaitheoir: | Brac University |
---|---|
Formáid: | General correspondence |
Teanga: | English |
Foilsithe / Cruthaithe: |
Brac University
2023
|
Ábhair: | |
Rochtain ar líne: | http://hdl.handle.net/10361/19907 |
Míreanna comhchosúla
-
Regarding inspection report of fire pump at BRACU NCP
de réir: Bengal Technological Corporation Ltd.(BTCL)
Foilsithe / Cruthaithe: (2023) -
Regarding test result as well as visual inspection report on the fire protection pipes
de réir: Brac University
Foilsithe / Cruthaithe: (2023) -
Clarification needed from Patterson Pumps (the manufacturer) regarding a major difference between the pumps ordered by BRAC University and pumps delivered by the contractor at project site
de réir: Brac University
Foilsithe / Cruthaithe: (2023) -
Regarding fire incidents and further precaution
de réir: Brac University
Foilsithe / Cruthaithe: (2023) -
Regarding fire incidents and further precaution
de réir: Brac University
Foilsithe / Cruthaithe: (2023)