Regarding inspection report of fire pump at BRACU NCP
This record consists of general correspondence regarding inspection report of fire pump at BRACU new campus project.
Auteur principal: | Brac University |
---|---|
Format: | General correspondence |
Langue: | English |
Publié: |
Brac University
2023
|
Sujets: | |
Accès en ligne: | http://hdl.handle.net/10361/19907 |
Documents similaires
-
Regarding inspection report of fire pump at BRACU NCP
par: Bengal Technological Corporation Ltd.(BTCL)
Publié: (2023) -
Regarding test result as well as visual inspection report on the fire protection pipes
par: Brac University
Publié: (2023) -
Clarification needed from Patterson Pumps (the manufacturer) regarding a major difference between the pumps ordered by BRAC University and pumps delivered by the contractor at project site
par: Brac University
Publié: (2023) -
Regarding fire incidents and further precaution
par: Brac University
Publié: (2023) -
Regarding fire incidents and further precaution
par: Brac University
Publié: (2023)