Regarding inspection report of fire pump at BRACU NCP
This record consists of general correspondence regarding inspection report of fire pump at BRACU new campus project.
Autor principal: | Brac University |
---|---|
Formato: | General correspondence |
Lenguaje: | English |
Publicado: |
Brac University
2023
|
Materias: | |
Acceso en línea: | http://hdl.handle.net/10361/19907 |
Ejemplares similares
-
Regarding inspection report of fire pump at BRACU NCP
por: Bengal Technological Corporation Ltd.(BTCL)
Publicado: (2023) -
Regarding test result as well as visual inspection report on the fire protection pipes
por: Brac University
Publicado: (2023) -
Clarification needed from Patterson Pumps (the manufacturer) regarding a major difference between the pumps ordered by BRAC University and pumps delivered by the contractor at project site
por: Brac University
Publicado: (2023) -
Regarding fire incidents and further precaution
por: Brac University
Publicado: (2023) -
Regarding fire incidents and further precaution
por: Brac University
Publicado: (2023)