Regarding inspection report of fire pump at BRACU NCP
This record consists of general correspondence regarding inspection report of fire pump at BRACU new campus project.
Main Author: | Brac University |
---|---|
Format: | General correspondence |
Language: | English |
Published: |
Brac University
2023
|
Subjects: | |
Online Access: | http://hdl.handle.net/10361/19907 |
Similar Items
-
Regarding inspection report of fire pump at BRACU NCP
by: Bengal Technological Corporation Ltd.(BTCL)
Published: (2023) -
Regarding test result as well as visual inspection report on the fire protection pipes
by: Brac University
Published: (2023) -
Clarification needed from Patterson Pumps (the manufacturer) regarding a major difference between the pumps ordered by BRAC University and pumps delivered by the contractor at project site
by: Brac University
Published: (2023) -
Regarding fire incidents and further precaution
by: Brac University
Published: (2023) -
Regarding fire incidents and further precaution
by: Brac University
Published: (2023)