Regarding inspection report of fire pump at BRACU NCP
This record consists of general correspondence regarding inspection report of fire pump at BRACU new campus project.
Κύριος συγγραφέας: | Brac University |
---|---|
Μορφή: | General correspondence |
Γλώσσα: | English |
Έκδοση: |
Brac University
2023
|
Θέματα: | |
Διαθέσιμο Online: | http://hdl.handle.net/10361/19907 |
Παρόμοια τεκμήρια
-
Regarding inspection report of fire pump at BRACU NCP
ανά: Bengal Technological Corporation Ltd.(BTCL)
Έκδοση: (2023) -
Regarding test result as well as visual inspection report on the fire protection pipes
ανά: Brac University
Έκδοση: (2023) -
Clarification needed from Patterson Pumps (the manufacturer) regarding a major difference between the pumps ordered by BRAC University and pumps delivered by the contractor at project site
ανά: Brac University
Έκδοση: (2023) -
Regarding fire incidents and further precaution
ανά: Brac University
Έκδοση: (2023) -
Regarding fire incidents and further precaution
ανά: Brac University
Έκδοση: (2023)