Regarding inspection report of fire pump at BRACU NCP
This record consists of general correspondence regarding inspection report of fire pump at BRACU new campus project.
Hlavní autor: | Brac University |
---|---|
Médium: | General correspondence |
Jazyk: | English |
Vydáno: |
Brac University
2023
|
Témata: | |
On-line přístup: | http://hdl.handle.net/10361/19907 |
Podobné jednotky
-
Regarding inspection report of fire pump at BRACU NCP
Autor: Bengal Technological Corporation Ltd.(BTCL)
Vydáno: (2023) -
Regarding test result as well as visual inspection report on the fire protection pipes
Autor: Brac University
Vydáno: (2023) -
Clarification needed from Patterson Pumps (the manufacturer) regarding a major difference between the pumps ordered by BRAC University and pumps delivered by the contractor at project site
Autor: Brac University
Vydáno: (2023) -
Regarding fire incidents and further precaution
Autor: Brac University
Vydáno: (2023) -
Regarding fire incidents and further precaution
Autor: Brac University
Vydáno: (2023)